O
Bossier City
← Bossier City

Bossier City · issues

Civic issues

Topics getting the most attention in Bossier City public meetings, ranked by how frequently they come up.

14 issues (filtered)10 topics
MediumDevelopment

O'Neal Subdivision amended plat

An amended plat for the 14.545-acre River Square Subdivision off Benton Road creates a small corner lot for a shared marquee sign that can advertise all the subdivision's lots.

2 mentions (2 this month)Last discussed Nov 9, 2026
HighDevelopment

Blight cleanup progress at Hall, Joannes and Jacquelyn Streets

The council worked through nine condemned or deteriorating houses, ordering four down and giving extensions to owners showing progress. These cases affect neighborhood safety and property values.

2 mentions (1 this month)Last discussed Nov 3, 2026
LowDevelopment

Multi-tenant sign at Safe Harbor Drive and Benton Road

A four-lot commercial subdivision, including a self-storage facility under construction, will get one shared monument sign for visibility from Benton Road; individual lot signs are off the table.

1 mention (1 this month)Last discussed Oct 12, 2026
MediumDevelopment

Forge Athletics drainage concerns

The indoor athletics complex site sits about four feet above North Point Community Church's south parking lot, and the church fears worse flooding in heavy rains; drainage plans will go to the city engineer.

1 mentionLast discussed Sep 14, 2026
LowDevelopment

Safe Harbor storage fencing and neighbor complaints

Staff said complaints keep coming about construction and lighting at the self-storage site, so the commission required the full perimeter fence before any building gets a certificate of occupancy.

1 mentionLast discussed Sep 14, 2026
HighDevelopment

Child care shortage in South Bossier

A new daycare and physical therapy facility is one step closer on 9.92 acres at Barksdale and Robert E. Lee. Commissioners noted the area's need for child care, especially for military families, but the site will generate about 150 drop-off and pick-up trips twice a day, so a traffic study is required before the city council decides.

1 mentionLast discussed Aug 10, 2026
MediumDevelopment

Folia development beautification and brick paver responsibility

The Folia developer can install extra landscaping, pavers and medians in city rights-of-way — but must maintain them and carry insurance. Councilor Hammons won confirmation that if the city ever replaces the brick pavers, it will use concrete.

1 mentionLast discussed Aug 4, 2026
MediumDevelopment

Annexation near Tiburon Street and Swan Lake Road

Nearly 29 acres on Swan Lake Road may shift from Residential-Agricultural to Limited Business, opening the door to commercial development. Commissioners flagged possible wetlands on the tract; the public hearing is still to come.

3 mentionsLast discussed Jul 21, 2026
MediumDevelopment

Belk Outlet subdivision and loading dock access

Sterling Properties is splitting the big Belk Outlet building at 2990 Meadow Creek Drive into three retail spaces, each needing its own loading dock and compactor. The variance lets docks encroach into the rear setback, with trucks routed off Meadow Creek Lane rather than Bean Boulevard.

1 mentionLast discussed Jul 20, 2026
LowDevelopment

Multigenerational care addition on Churchill Drive

A retired Air Force senior master sergeant won permission to add a second dwelling unit so his parents — including a Navy veteran with Alzheimer's — can be cared for at home instead of in institutional care.

1 mentionLast discussed Jul 13, 2026
MediumDevelopment

Cactus Wellhead industrial expansion

An oil-and-gas equipment company is adding an 11,000-square-foot building with office and service space on 10 acres near Meadow Lane, keeping 14 existing jobs in Bossier.

2 mentionsLast discussed Jul 13, 2026
MediumDevelopment

118-acre manufactured home subdivision at River Bend

A 118.83-acre former racetrack site would become a manufactured-home subdivision with a training center; the dilapidated existing condos would eventually be torn down after occupants are rolled into the new plan.

2 mentionsLast discussed Jun 8, 2026
MediumDevelopment

Red River Chevrolet modular office at 215 Barksdale Boulevard

The dealership's used car operations moved to Barksdale Boulevard about a year ago and operate out of a temporary modular building while the East Texas Street lot is being sold. The commission gave only six more months and wants to see building plans before any further extension.

1 mentionLast discussed May 14, 2026
HighDevelopment

South Bossier Redevelopment Plan funding

A $1.2 million appropriation was introduced for the final phase of the South Bossier redevelopment, tied to a decades-old federal consent decree. A resident pushed for the public to see the plan documents before the final vote.

2 mentionsLast discussed May 12, 2026